Elektromontaż Poznań S.A. is carrying out installation work at the Konin Power Station

Zawartość

Since the first quarter of 2011, we have been carrying out the project: "Installation of electrical systems for the CFB boiler at the Konin Power Station". The client is EL PAK Sp. z o.o., a company specialising in automation and electrical equipment services. The project is scheduled for completion in the third quarter of 2011.

Scope of work:
Installation of equipment (transformers, inverter cabinets, UPS units, DC switchgear); supply and installation of cable routes; supply and installation of cables, including fire seals and measurements; supply and installation of earthing systems; cable structures; as-built documentation