We create state-of-the-art office and hotel spaces.
Our company specialises in low- and high-voltage installations in all types of buildings. Our many years of experience and expertise enable us to guarantee you the highest quality of workmanship.
Project: University Business Park office buildings in Łódź
Main contractor: Strabag Sp. z o.o. Construction
period: Q3 2008 – Q3 2010
Scope of works: complete installation of high-voltage electrical systems in the office buildings, including in particular: power supply; electricity distribution, cable routes; internal power supply lines; switchgear and distribution boards; installation of lighting fixtures; consumer installations; lightning protection, earthing and equipotential bonding systems; emergency lighting control system; external roller shutter control system; driveway heating system; vestibule heating system; groundworks for external lighting, power supply to barriers and the intercom system; power supply to smoke vents and ventilation systems for stairwells and garages.
Project: Rondo ONZ office building in Warsaw
Client: Hochtief Development Construction period: Q1 2004 – Q4 2005
Area: 106,000 m²
Volume: 308,000 m³
Scope of works: installation of a 2500 KVA power generator, installation of 1250 and 1600 KVA cast resin transformers – 13 units, installation of MV switchgear – 28 bays, LV main switchgear – 18 units, 364 LV distribution boards, installation of over 1,000 m of busbars from 800 to 3,600 A, over 200 km of cables and wires, installation of approx. 23,000 lighting fixtures, laying of 10 km of cable routes (including fire-rated routes with E-90 certification), detailed design and as-built documentation
Project: The Globis office and retail building in Poznań
Client: Globe Trade Centre S.A. in Warsaw
Construction period: Q2 2002 – Q1 2003
Floor area: 18,000 m²
Volume: 59,000 m³
Scope of works: high-voltage electrical installations: cable routes, lighting installations, power distribution and process switchboards, internal power supply lines; telecommunications installations: fire alarm system, emergency public address system, burglar and panic alarm systems, and CCTV with a BMS surveillance system and access control.
Construction: Office building for the State Airports Authority in Warsaw
Investor: PP “Porty Lotnicze”
Client: Budomex Unibud
Completion date: Q4 2000 – Q1 2002
Scope of works: 15/04 kV substation, two 100 kVA transformers, 15 kV MV switchgear, RG-LV switchgear, connection, high-voltage installations
Main Contractor: Skanska S.A.
Construction period: Q3 2019 – Q4 2020
Scope of work: installation of high-voltage electrical systems
Main Contractor: BUDIMEX S.A.
Construction period: Q4 2018 – Q1 2020
Scope of work: installation of high- and low-voltage electrical systems and plumbing
Main Contractor: Warbud S.A.
Construction period: Q1 2018 – Q3 2018
Scope of work: installation of high-voltage electrical systems
Main Contractor: SKANSKA S.A.
Construction period: Q2 2017 – Q3 2018
Scope of work: installation of high-voltage electrical systems
Main Contractor: PORR Polska Construction
Construction period: Q1 2016 – Q3 2017
Scope of work: installation of high-voltage and telecommunications systems
Development: The Pixel office building, at the junction of Grunwaldzka and Babimojska streets in Poznań (one of five buildings forming a complex of modern office buildings – the Grunwaldzka Cluster)
Developer: Garvest Real Estate
Design: JEMS Architekci
Contractor: Budimex S.A.
Construction period: Q4 2011 – Q3 2012
Scope of works: 15kV MV cable connections from the K-18 and MST-152 substations to the building; complete high-voltage installations, including, amongst others: MV power supply, lighting installations, power supply lines, 0.4kV main switchboards.
Project: Andersia Tower office, hotel and retail complex in Poznań
Client: GI Probuild sp. z o. o.
Main Contractor: Hochtief Polska (floors 11–13)
Construction period: Q3 2007 – Q3 2008
Total floor area of the building: over 42,000 m²
Total volume of the building: over 190,000 m³
Scope of works: levels 11–13: installation of electrical systems for lighting and socket outlets; levels 14–16: installation of lighting systems, socket outlets and structured cabling
Project: Topaz 2 office building in Warsaw
Developer: Globe Trade Centre S.A. (GTC)
Construction period: Q1 2005 – Q4 2006
Scope of works: Comprehensive electrical works, including: low-voltage transformer and distribution stations, distribution networks, cable routes, fire protection for power distribution systems, non-lighting consumer installations, emergency lighting, earthing, control and monitoring systems, general lighting, an emergency power supply system with a generator set, and an uninterruptible power supply (UPS) system.
Project: Poznań Capital Group office complex in Poznań
Client: Poznań Capital Group Sp. z o.o. Construction
period: Phase I: Q4 1998 – Q3 1999
Phase II: Q2 2002 – Q1 2003
Area: 29,000 m²
Volume: 116,000 m³
Scope of works: high-voltage electrical installations, preparation of detailed design documentation. Installation of MV switchgear, internal power supply lines, power and lighting circuits, earthing, and lightning protection systems. An interesting feature is the installation of an artistic lighting system using fibre optics.
Investor: X20 Sp. z o.o.
Project period: Q4 2019 – Q4 2020
Scope of work: electrical and low-voltage works (including in the underground car park)
Main Contractor: Hochtief Polska S.A.
Construction period: Q3 2017 – Q1 2020
Scope of work: installation of high-voltage and low-voltage systems (for buildings B1, B2, B3, B6, B8, B9) including detailed design
Main Contractor: Budimex S.A.
Project duration: Q2 2018 – Q2 2019
Scope of work: supply, installation and commissioning of electrical and telecommunications systems
Main Contractor: Budimex S.A.
Project period: Q3 2017 – Q2 2019
Scope of work: installation of high- and low-voltage systems
Main Contractor: Budimex S.A.
Construction period: Q2 2017 – Q2 2019
Scope of work: installation of high-voltage electrical systems