We are responsible for the construction of numerous retail and warehouse facilities.
Our company specialises in low- and high-voltage installations in all types of buildings. Our many years of experience and expertise enable us to guarantee you the highest quality of workmanship.
Our references include:
Shopping centres
Construction: Wroclavia Shopping Centre in Wrocław
Developer / Client: WOOD Sp. z o.o.
Construction period: Q4 2015 – Q1 2018
Scope of work: installation of high-voltage electrical systems, including detailed design
Construction: Galeria Słoneczna shopping centre in Radom
Client: AIG/Lincoln Polska sp. z o.o.
Contracting authority: PORR (Polska) S.A.
Construction period: Q4 2009 – Q3 2011
Area: 110,000 m²
Scope of works: electrical installations, including: 15 DRAWA MV switchgear panels, 7 transformers, each rated at 2 MVA, LV switchgear, capacitor banks, 40 km of cable routes, 120 km of power cables and wires, 1 km of busbars with a current-carrying capacity of 2500 and 3200A, 8,000 light fittings, UPS units, ramp heating, lightning protection and earthing systems, outdoor lighting and outdoor MV power cables, telecommunications installations, including: Fire Alarm System, Public Address System, Intrusion and Burglary Alarm System, Access Control, CCTV system, structured cabling and intercom system.
Construction: Focus Park entertainment and retail centre in Zielona Góra
Developer: Parkridge C.E. Developments
Client: Bovis Polska
Construction period: Q2 2007 – Q2 2008
Scope of work: installation of over 11 km of cable routes, 4 cable trays and 9 busbars, installation of over 65 km of cables and wires, installation of earthing and equipotential bonding systems, installation of the structured office network for the entire building, installation of over 3,100 light fittings (for internal lighting and external lighting of the car park and façade), supply and installation of a 10-field DRAWA MV switchgear, 2 LV substations and 25 branch substations (also supplied by ZPUE Elektromontaż Poznań)
Project: Extension of the Stary Browar Centre for Trade, Art and Business in Poznań
Client: Fortis Sp. z o.o.
Project period: Q3 2006 – Q1 2007
Scope of works: low-voltage installations, including: installation of the GEMOS building management system, fire alarm system, public address system, fire damper automation, access control, intrusion and burglary detection system, CCTV system, and electrical and ICT installations for security systems.
Project: IKEA retail park in Matarnia near Gdańsk
Client: IKEA Polska
Construction period: Q1 2005 – Q2 2006
Area: 40,000 m²
Volume: 415,000 m³
Scope of works: Outdoor lighting and telecommunications networks, high-voltage works, including: installation of a 4 x 1000 kVA transformer station, a generator set, busbars and switchgear; Low-voltage installations: fire alarm system, public address system, telephone system, CCTV, building management system (BMS) and monitoring of technical installations. Preparation of construction drawings
Construction: Polimeni Shopping Centre in Gniezno
Investor: Polimeni International Sp. z o.o.
Contracting Authority: Budimex Dromex Poznań Branch Construction period: Q3 2004 – Q2 2005
Area: approx. 16,000 m²
Volume: 80,000 m³
Scope of works: high- and low-voltage electrical installations (systems: anti-burglary, TV, fire protection, telephone and anti-theft systems), 15/04 kVA transformer station, 15 kV connection.
Construction: Auchan retail and service centre in Płock
Client: Auchan Polska sp. z o.o.
Contracting authority: Trasko Inwest sp. z o.o.
Construction period: Q4 2001 – Q2 2002
Scope of works:
sub-distribution boards, cabling, CANALIS busbars, power supply and socket installations, internal and external lighting, fire alarm system, CCTV, emergency alarm system for disabled people
Construction: Focus Mall shopping centre in Zielona Góra
Main Contractor: Mostostal Warszawa S.A.
Construction period: Q1 2019 – Q4 2020
Scope of work: installation of sanitary systems, including detailed design
Construction: Zielone Arkady Shopping Centre in Bydgoszcz
Main Contractor / Client: STRABAG Sp. z o.o.
Project period: Q1 2014 – Q2 2016
Scope of work: installation of high- and low-voltage electrical systems, including detailed design
Construction: Galeria Jurajska shopping centre in Częstochowa
Client: Globe Trade Centre
Main contractor: Strabag Construction period: Q1 2008 – Q3 2009
Scope of work: Power supply to the facility (a cable route nearly 900 km long, running across roads, railway tracks and the River Warta), lighting installations (approx. 9,000 luminaires for the entire site), supply and installation of MV switchgear, supply and installation of main LV switchgear and 6 transformers with a capacity of 2000 kVA each, supply and installation of a 1250 kVA generator set.
Our company will also carry out low-voltage installations at the site, including, amongst others: a fire alarm system, a public address and background music system, structured cabling, satellite and TV installations, CCTV systems, intruder and assault alarm systems, customer counting systems, intercom systems, automation systems and BMS.
Construction: Focus Park Leisure and Retail Centre in Bydgoszcz
Investor: Parkridge C.E. Developments
Client: Parkridge C.E. Developments
Construction period: Q1 2007 – Q1 2008
Scope of works: Main power supply to the facility – two MV cable routes, external lighting around the facility, cable ducts for LV cables supplying historic buildings.
Construction: Forum Entertainment and Shopping Centre in Gliwice
Client: Braaten + Pedersen Denmark
Contracting authority: BUDIMEX – DROMEX S.A
Construction period: Q3 2006 – Q3 2007
Area: 90,000 m²
Scope of works:
high-voltage installations, including: transformer stations – 2 sets, transformers – 6 units, low-voltage main switchboards with capacitor banks – 7 units, LV sub-switchboards – 74 units, central battery, 250 kVA generator set, UPS systems, cable lines – 210 km, busbars – 18 units, lighting – 10,000 units, cable routes – 14 km, heating of access roads, pipelines, gutters and roof drains, lightning
protection system, low-voltage systems, including: SAP fire alarm system, public address system (DSO), intrusion, assault and access control system (SSWIN + KD), CCTV, cable TV, video intercom system, structured cabling, car park system, people counting system
Project: IKEA Targówek Retail Park in Warsaw
Developer: Inter IKEA Centre Polska SA
Construction period: Q3 2005 – Q1 2007
Area: 75,100 m²
Volume: 534,200 m³
Scope of works: high- and low-voltage electrical installations, including a fire alarm system, an access control system, telephone installations and CCTV. Installation of MV switchgear, LV main switchgear and other LV switchgear, internal power supply lines, power and lighting installations. Preparation of construction drawings
Construction: Selgros Cash & Carry wholesale centres in Katowice, Radom, Poznań, Szczecin, Łódź, Warsaw and Wrocław
Developer: Selgros Sp. z o.o. Construction
period: /for a typical facility/ 1.5 quarters
Building area: 22,000 m² Volume: 208,000 m³
Scope of works: high- and low-voltage electrical installations: power and lighting installations for the wholesale hall and shopping arcade, 15/04 kV transformer station, 630 kVA generator set, UPS system, and control, signalling and emergency lighting systems.
Project: Auchan Retail and Service Centre in Rumia
Investor: Auchan Polska sp. z o.o.
Client: Auchan Polska sp. z o.o.
Construction period: Q2 2007 – Q3 2007
Area: 11,800 m²
Scope of works: Supply and installation of 2 x 1250 kVA transformers and a 1000 kVA generator set, 2 LV main switchboards, several dozen building switchboards, installation of 17 km of internal power supply lines and 3.5 km of cable routes, 2 UPS units (uninterruptible power supplies) rated at 80 kVA and 20 kVA, and a central emergency lighting battery with a capacity of 44 kVA
Logistics centres
Project: Jeronimo Martins Logistics Centre in Kostrzyn Wielkopolski.
Client: Jeronimo Martins Kostrzyn Wielkopolski.
Construction period: Q3 2004 – Q1 2005
. Floor area: 20,000 m² of warehouse space; office space 1,000 m²
Volume: 252,000 m³
Scope of works: 630 kVA transformer station, high-voltage installations. fire protection systems and structured cabling; work is currently underway on the installation and connection of a 400 kVA power generator
Project: Volkswagen logistics centre in Swarzędz
Developer: ILS Sp. z o.o. Swarzędz Jasin
Construction period: Q2 2002
Area: 112,000 m²
Volume: 1,568 m³
Scope of works: high-voltage installations: 15kV MV power supply lines, cable lines and busbar trunking, 15kV main switchyard and 15/0.4kV transformer substations, outdoor lighting installations, power supply for process equipment based on a transformer with a short-circuit voltage of 4%
Construction: Extension and refurbishment of the Lidl Distribution Centre in Rusocin (Pruszcz Gdański district)
Main Contractor: Allcon Budownictwo sp. z o.o.
Construction period: Q4 2019 – Q4 2020
Scope of work: installation of comprehensive high-voltage systems and BMS
Project: Warehouse with a separate staff area for Aluplast
Client: Aluplast Sp. z o.o.
Completion period: Q4 2003 – Q4 2004
Area: 10,000 m²
Volume: 120,000 m³
Scope of works: extension of the switchgear room, installation of transformers with power supply, cabling, earthing installation, installation of internal power supply lines, power and lighting installation in the staff and office area and in the warehouse, low-voltage installations