We contribute to the creation of facilities that protect the natural environment.
Our company specialises in low- and high-voltage installations in all types of buildings. Our many years of experience and expertise enable us to guarantee you the highest quality of workmanship.
For our clients, we have carried out:
Water intakes
Construction: Sowińcu Krajkowie water intake Client: Aquanet Sp. z o.o.
Project period: Q1 2004 – Q4 2004
Capacity: 8,000 m³/day
Scope of works: The contract involved comprehensive high- and low-voltage works.
These included the laying of approximately 8 km of high-voltage cables, the laying of 25 km of low-voltage cables, and the installation of a 15/04 kV high-voltage substation. In the pumping station building, electrical installations were carried out for the water intake wells, infiltration ponds and valves.
Water treatment plants
Project: Water Treatment Plant in Mosina
Client: Aquanet Sp. z o.o.
Project period: Q1 2004 – Q4 2004
Capacity: 100,000 m³/day
Scope of works: The contract involved comprehensive high- and low-voltage electrical works. These included the modernisation of the power supply system, a new 28-pole MV substation, main and control switchgear for the pumping station, and inverter systems powering flow pumps with a total capacity of 4 MW.
Sewage treatment plants
Construction: Electrical installation works at the wastewater treatment plant belonging to the Hochland factory in Sovata, Romania
Client: Hochland Romania SRL
Contracting authority: Enviro Chemie Germany (works on the treatment plant site)
Project period: Q2 2007 – Q3 2007
Scope of work: Laying of 9 cores of YKXS 1x185 mm² power cable in protective conduits from the NSHV main switchboard on the plant premises to the UV-HT2 switchboard in the sewage treatment plant’s technical building, installation and connection of the UV-HT2 switchgear manufactured by ZPUE Elektromontaż Poznań, installation of internal and external lighting. Installation of plug sockets, installation of a lightning protection system and an equipotential bonding system, connection of the sewage treatment plant’s process equipment to the electrical system.
Construction: Central Wastewater Treatment Plant in Koziegłowy near Poznań
Client: MPWiK
Construction period: 1990–2001 and 2005–2007
Capacity: 200,000 m³ per day
Scope of work: The contract included the installation and commissioning of transformer and switchgear stations, power supply and control systems, as well as lighting and lightning protection systems.
Construction: Południe Wastewater Treatment Plant in Warsaw
Client: MPWiK in Warsaw
Contracting Authority: Consortium of Maxer S.A., Hydrobudowa 9, Wrocław and Włocławek
Construction period: Q4 2001 – Q2 2005
Biological treatment phase duration: 6 quarters
Capacity: 112,000 m³ per day (expandable to 224,000 m³ per day)
Scope of works: extension of the 110/15 kV substation, 15 kV cable supply, construction and commissioning of MV and LV switchgear as well as the transformer station, lighting and power distribution systems
Waste incinerators
Main Contractor/Client: Hochtief EfW Poznań s.c.
Project period: Q4 2013 – Q4 2016
Scope of works: design and installation of electrical systems, including, amongst others, a 110kV cable line, as well as the design and installation of plumbing systems